Installation of Sunamp Heat Battery and Solar PV with Electric Battery Storage

Sunamp Heat Battery and Solar PV with Electric Battery Storage

Grange Estate – Strupie Beag, at Aigas Field Centre

Installation of Sunamp Heat Battery and Solar PV with Electric Battery Storage


Reason for Opting for Heat Battery

Grange Estate and Aigas Field Centre are committed to being as as green as possible, therefore wishing to instil this in the design and construction of a new Field Centre staff accommodation building. Electricity supply was also limited, therefore they opted to generate their own electricity, store it and store excess generation into a heat battery system.

The Solution

R&I Cruden supplied and installed a 6kw Solar PV array, connected to LG 10kW/h electric storage battery which supplies the Sunamp heat batteries with 6kW for domestic hot water and 12kW for heating system.

The Result

  • Cost effective – long term savings in energy bills
  • Green solution – in keeping with company ethos
  • Low maintenance required for the system



Latest RiCruden News


Project Announcement: Raigmore Hospital Pharmacy

Published On: Thu Apr 22nd, 2021

Read the Full Article »

Employment Opportunity: Electrical Engineer

Published On: Thu Apr 15th, 2021

Read the Full Article »

Partners

vaillant Grant Worchester Sunamp Mitsibushi

Memberships

Gas Safe CHAS MCS snipef

Copyright © 2021 R&I Cruden Ltd

Designed & Developed by Velocity Design Logo