John Clark Motor Group had high electricity costs and a net zero target to reduce direct carbon emissions. looking to bring down running costs amidst the electricity costs rising. A solar PV Installation was their best solution for this.

Our team at work on the solar PV Installation.
The solution:
A 310 -panel on roof solar PV installation with a total of 127.10 kWp and 50kWh containerised battery storage with 50kW charge and discharge. The battery storage captures excess solar generation during the day to be offset at night – it also allows the customer to charge from the grid during off peak rates. A SolarEdge PV system was selected due to its increased efficiency with panel optimisation and 20 year extended warranty option.
Audi Dundee now enjoy 28% reduction in electricity costs and save over 24 tonnes of carbon per year.

The outcome:
RI Cruden provided a complete package from design, planning through to installation and commission including Planning permission, Glint and Glare assessments, DNO applications and authorisations. Audi Dundee now enjoy 28% reduction in electricity costs and save over 24 tonnes of carbon per year.
Key Facts
Client
- John Clark Motor Group
Cost
- £245,000.00
Estimated Carbon Saving
- 24 tonnes per year (equivalent to planting 1100 trees)
Estimated Payback Period
- 3 Years
Equipment Installed
- 127.10kWp DMEGC Solar Panels
- 99.9kW SolarEdge Inverters
- 50kWh containerised ESS battery storage with built-in fire suppression and HVAC system
Related Posts
1st December 2024
High Range Lodge, Aviemore
Located in the Scenic Cairngorm National Park, High Range Lodge in Aviemore,…
6th August 2024
Ross Shire Engineering – Machine Shop PV
Faced with recurring issues with efficiency and battling on-going faults, RSE's…
22nd May 2024
John Clark Motor Group – BMW Dundee
John Clark Motor Group had high electricity costs and a net zero target to…